Over a period of more than 50 years, the team has built power transmission lines with a voltage of 35-500 kV both for creating a power system and for external power supply to industrial enterprises, including: phosphorous, tire, oil refining and cement plants in Shymkent and Sas-tobe village, the mines of the Achpolimetal and Baizhansai combine.
The railway electrification project was implemented to connect 220 kV "Tyulkubas"," Kyzylsay"," Badam"," Arys"," Moytantash","Zhideli" traction substations.

1980 / 1989

Built and put into operation: 500 kV overhead line — 1950 km, 220 kV overhead line — 3500 km, 110 kV overhead line — 25550 km, 35 kV overhead line — 1500 km, 10 kV overhead line — 20000 km.

The first 500 kV overhead power lines in the South of Kazakhstan "Chimkent-Tashkent GRES", 500 kV overhead power lines of "Leninskaya" substation, 500 kV overhead power lines of "Syrdarya" substation, Guzar substation, 500 kV overhead power lines of "Regar" substation were built. A significant contribution was made to the electrification of rural areas of the region.

1990 / 1999

The construction of strategic facilities to support the electrification of the city of Shymkent, in particular, the 110 kV Leninskaya-Zapadnaya overhead line, the 220 kV SEZ Ontustik substation, the 35/10 kV Nur-Sat substation with the removal of the 35 kV overhead line from the development zone of the Nursat microdistrict, the 110 kV double-chain overhead line, the Shymkent substation of YUPM CJSC, the 110 kV double-chain overhead line, the Inkai substation, and the RU-6 substation with a length of 160 km.

A 110 kV overhead line "PS Balkhash-PS NPS 9"was built for the power supply of pumping stations at the Atasu (Kazakhstan) — Alashankou (China) oil pipeline that was at construction stage.

2000 / 2020

In 2001, the 35 kV GPP-2 – GPP-M2 substation of the Katko JV was built. In 2005, a double-chain 110 kV overhead line was built. "Sholak – Kurgan – Tortkuduk PS" with a length of 105 km for the electrification of plants under construction.

Construction and installation works on mine electrification, installation of complete transformer substation of outdoor installation, construction of 110 kV substation, installation of 10 kV overhead line, 35 kV overhead line, 110 kV overhead line were performed for Inkai LLP JV

In 2007-2008, construction and installation work was performed on the first unique 220 kV block substation in Kazakhstan, concrete complete transformer substation (M) 220/10-5 AN, manufactured by "UK "Electroshield" TM Samara" LLC.

In 2010-2011, the construction of a 110 kV switchgear was performed within the framework of the project "Expansion of the Kumkol GTU" for "PetroKazakhstan Kumkol Resources" JSC.

Since 2010, work has been carried out on the construction of technological injection and pumping wells at the Yuzhny Moinkum field for Katko LLP JV. In 2011-2013, work was carried out on the construction of technological in and out pumping wells at the Kharasan-2 field, more than 360 km of pumping and pumping wells were developed for "Bayken-U" LLP.

In 2008-2010, the construction project "On-site engineering networks (water supply, sewerage, electricity, telephony, gas supply) of the special economic zone of the SEZ "Ontusik" of the South Kazakhstan region was completed. Water supply facilities No. 1 and No. 2 and "Sewage pumping station".

In 2010, the construction of the repair and production base of "Uranenergo" LLP in the village was completed in Shieli village and creation of the telecommunications system (ETS) of Uranenergo LLP.

Construction and installation works have been carrying out for "Katko" LLP JV for 10 years. The work included construction of service sites, including earthworks of varying complexity, electrification of construction sites, laying of HDPE pipelines and fiberglass pipes "Hobas", installation of drain wells and wells for plunger, installation of lightning protection and lighting of sites, construction of a shift camp, construction of a 50-ton car weight, construction of concrete platforms, construction of on-site engineering networks, fencing.

In 2011-2012, general construction works were carried out for "Bayken-U" LLP on the construction of a technological road, construction of the main productive and leaching pipelines together with repair and restoration works, the construction of acid pipelines, the installation of sludge accumulators and the vertical layout of blocks for technological drilling of wells.

In 2017-2019, work was performed on the construction of technological injection and pumping wells at the Ortalyk and Appak fields, more than 150 pumping and pumping wells were developed for "Volkovgeologiya" JSC.

In 2019-2020 the Completion of electrification of settlements.Yergaliyeva, Zhanbay, Zineden, Tushchykuduk, Isatay district, Atyrau region project was implemented.

In 2020, work began on "Construction of engineering infrastructure and landscaping of multi-storey residential buildings with social and public service facilities and a sports and recreation complex at 74B, 74B, 74G Abilkayyr Khan Ave. microdistrict Nursaya Atyrau " (off-site power supply networks and on-site power supply networks)".