Leave a request
  • Design of engineering  systems and networks

    Design of engineering
    systems and networks

    01 / 03

    Read more

  • Search and exploration  of uranium deposits

    Search and exploration
    of uranium deposits

    02 / 03

    Read more

Slide background

Electrification

Drilling

❯ To learn more

Electrification

Design of engineering

systems and networks

50 000 km+
high-voltage lines
built and put
into operation

Electrification

Slide background

❯ To learn more

Drilling

Search and exploration

Search and exploration of
reservoir-infiltration
deposits

Drilling

of uranium deposits

Services

"Mechanized Column No. 49" LLP has a license of GSL No. 003412 for performing construction and installation works on the Category I.
Electrification

Electrification

Design of engineering systems and networks. Full range of electrical measurement works in our own electrical laboratory
Drilling operations

Drilling operations

Construction of exploration, hydrogeological, and technological wells.
Rental of special equipment

Rental of special equipment

"Mechanized column No. 49" LLP offers to rent new equipment or equipment with a small operating time.
500+

500+

Projects
500+

500+

Workers
65 years

65 years

Huge experience
100+

100+

Special equipment

About Mechanized colum №49

The company is engaged in the design and capital construction, reconstruction of high-voltage lines, power transmission lines and substations, buildings and structures, drilling of exploration wells with core sampling, technological injection and pumping wells. Reclamation of radiation territories and objects. The company has its own accredited laboratory.

See more

Geography
of our work

We work not only on the territory of
the Republic of Kazakhstan, but also in the countries of Central Asia. .

Our projects

Built and put into operation: 500 kV overhead line — 1950 km, 220 kV overhead line — 3500 km, 110 kV overhead line — 25550 km, 35 kV overhead line — 1500 km, 10 kV overhead line — 20000 km.
A 110 kV overhead line "PS Balkhash-PS NPS 9"was built for the power supply of pumping stations at the Atasu (Kazakhstan) — Alashankou (China) oil pipeline that was at construction stage.
In 2010-2011, the construction of a 110 kV switchgear was performed within the framework of the project "Expansion of the Kumkol GTU" for "PetroKazakhstan Kumkol Resources" JSC.
In 2001, the 35 kV GPP-2 – GPP-M2 substation of the Katko JV was built.
Construction and installation works on mine electrification, installation of complete transformer substation of outdoor installation, construction of 110 kV substation, installation of 10 kV overhead line, 35 kV overhead line, 110 kV overhead line were performed for Inkai LLP JV
In 2017-2019, work was performed on the construction of technological injection and pumping wells at the Ortalyk and Appak fields, more than 150 pumping and pumping wells were developed for "Volkovgeologiya" JSC.
In 2010, the construction of the repair and production base of "Uranenergo" LLP in the village was completed in Shieli village and creation of the telecommunications system (ETS) of Uranenergo LLP.
In 2019-2020 the Completion of electrification of settlements.Yergaliyeva, Zhanbay, Zineden, Tushchykuduk, Isatay district, Atyrau region project was implemented.
In 2020, work began on "Construction of engineering infrastructure and landscaping of multi-storey residential buildings with social and public service facilities and a sports and recreation complex at 74B, 74B, 74G Abilkayyr Khan Ave. microdistrict Nursaya Atyrau " (off-site power supply networks and on-site power supply networks)".
  • Geography
    of our work

    We work not only on the territory of
    the Republic of Kazakhstan, but also in the countries of Central Asia. .

    Our projects

  • Built and put into operation: 500 kV overhead line — 1950 km, 220 kV overhead line — 3500 km, 110 kV overhead line — 25550 km, 35 kV overhead line — 1500 km, 10 kV overhead line — 20000 km.
  • A 110 kV overhead line "PS Balkhash-PS NPS 9"was built for the power supply of pumping stations at the Atasu (Kazakhstan) — Alashankou (China) oil pipeline that was at construction stage.
  • In 2010-2011, the construction of a 110 kV switchgear was performed within the framework of the project "Expansion of the Kumkol GTU" for "PetroKazakhstan Kumkol Resources" JSC.
  • In 2001, the 35 kV GPP-2 – GPP-M2 substation of the Katko JV was built.
  • Construction and installation works on mine electrification, installation of complete transformer substation of outdoor installation, construction of 110 kV substation, installation of 10 kV overhead line, 35 kV overhead line, 110 kV overhead line were performed for Inkai LLP JV
  • In 2017-2019, work was performed on the construction of technological injection and pumping wells at the Ortalyk and Appak fields, more than 150 pumping and pumping wells were developed for "Volkovgeologiya" JSC.
  • In 2010, the construction of the repair and production base of "Uranenergo" LLP in the village was completed in Shieli village and creation of the telecommunications system (ETS) of Uranenergo LLP.
  • In 2019-2020 the Completion of electrification of settlements.Yergaliyeva, Zhanbay, Zineden, Tushchykuduk, Isatay district, Atyrau region project was implemented.
  • In 2020, work began on "Construction of engineering infrastructure and landscaping of multi-storey residential buildings with social and public service facilities and a sports and recreation complex at 74B, 74B, 74G Abilkayyr Khan Ave. microdistrict Nursaya Atyrau " (off-site power supply networks and on-site power supply networks)".
    65  years inthe market

    65 years in
    the market

    Licenses and certificates

    Licenses and
    certificates

    Completed projects

    Completed projects

    Vacancies

    Vacancies

    Our special equipment

    Our special
    equipment

    • "Mechanized Column No. 49" LLP has a license of GSL No. 003412 for performing construction and installation works on the Category I.
    Leave a request